Develop a work breakdown structure

Define the project objective(s) and list the assumptions about the project. (10)

2.2 Develop a work breakdown structure. (10)

2.3 Prepare a list of the specific activities that need to be performed to achieve the project objective(s). (10)

2.4 For each activity, assign the person who will be responsible. (5)

2.5 Create a network diagram that show the sequence and dependent relationships of all the activities.

The post Develop a work breakdown structure appeared first on edubrained.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"