Develop a work breakdown structure
Define the project objective(s) and list the assumptions about the project. (10)
2.2 Develop a work breakdown structure. (10)
2.3 Prepare a list of the specific activities that need to be performed to achieve the project objective(s). (10)
2.4 For each activity, assign the person who will be responsible. (5)
2.5 Create a network diagram that show the sequence and dependent relationships of all the activities.
The post Develop a work breakdown structure appeared first on edubrained.
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"
